EPC of 500TPH HPGR crushing line, complete with HV power distribution system
EPC of 500TPH HPGR crushing line, complete with HV power distribution system, LV power distribution system, all civil, electrical, instrumentation and mechanical works for entire HPGR crushing line with integration to existing plant.
Year : 2020-2021
EPC of 100+862m long 800TPH overland belt conveyor
EPC of 100+862m long 800TPH overland belt conveyor for transport of gold ore.
Year : 2017-2018
EPC of 800TPH conveying system upgrade
EPC of 800TPH conveying system upgrade of 600m long existing conveyor + 4 x 40m long portable conveyor system for stacking + 16 x 40m long portable conveyor upgrade
Year : 2019-2020
EPC of Bulghah Water Management Station and Crushing Line # 1 Dust Suppression System
The Dust Collectors x 3 Nos. will be moved so that their discharge is directly above the Conveyors. Dust Collectors will be updated so that they can be controlled and monitored via the existing Process Control System, with additional monitoring sensors. The Potable Water Station is to be upgraded with additional tanks and local/remote control and monitoring of the system. The Dust Suppression will be updated to cover the Stockpile.
Year : 2022-2023
EPC of Process Control System Upgradation
Centralize the PLC workstation for existing electrical rooms ER3, ER4 & ER5 to single location at ER12 through an upgrade with the network architecture
Year : 2022-2023
EPC of CV 13 conveyor
Design, supply and installation of CV 13 conveyor
Year : 2023
Design, supply and installation of damaged Lifter frame 6-8m height
( STACKING CONVEYOR)
Design, supply and installation of damaged Lifter frame 6-8m height (STACKING CONVEYOR)
Year : 2021-2022
Design, Manufacturing and Supply of CIC Tanks
Manufacturing and Supply of CIC Tanks
Year : 2022
Supply, Installation and Commissioning of Metal detector system
Installation of a Metal detector system in the BC3 Conveyor to detect any metal scraps getting
transferred with conveying material
Year : 2022-2023
Repair and inspection requirements for the Bulghah Stockpile Conveyor, CV #5
Repair work for the Stockpile Conveyor hanging system and conveyor assessment study including DLUBAL analysis, vibration analysis, Thermo Graphic analysis and 3D Laser scanning to identify the weak areas of conveyor and to propose the corrective action plan.